South End Station CMAR RFP

South End Station Project will design and construct a new light rail station with offset side platforms adjacent to the Publix Supermarket and 2161 Hawkins development in South End. The project team completed a project delivery assessment and selected Construction Manager at Risk (CMAR) as the appropriate method to deliver this project. 

PSR# 1483

 

CATS MOW Tremont Grade Crossing Gate Mast Relocation FY24 Shutdown CANCELLED

Contractor shall furnish the necessary equipment, traffic control and labor to remove the existing west bound traffic gate and install a new gate per the approved Plans. The Owner (CATS) shall provide the existing cable, gate foundation and new crossing gate, with all appurtenances, to be installed.
Contractor shall:
A. Contractor shall submit a schedule and detailed workplan for approval prior to the start of work.
B. Contractor shall develop, and submit for approval, test procedures and test forms for the new gate and crossing prior to executing field work.
C. Set up approved traffic control to protect the crossing during the Work both vehicle traffic and pedestrian traffic..
D. Remove the existing gate and deliver it to the North Yard Maintenance Facility or other CATS property as directed.
E. Remove all, or a sufficient amount, of the gates’ foundation so as to replace the soil and sidewalk.
F. Contractor shall demolish the sidewalk and excavate for a new gate foundation per approved Plans. Existing conduit shall be intercepted and rerouted into the new foundation. Contractor shall provide the necessary conduit, sweeps, supports, couplings and glue. Existing cable shall be un-landed, tested and terminated for the new gate.
G. Contractor shall remove and install new ADA compliant Truncated Dome.
H. Contractor shall set the new foundation and gate, provided by the Owner, and adjust gate arm length, counterweights, arm lights and light directions per the approved Plans and MUTCD requirements.
I. Contractor shall test the new gate and crossing operation.
J. Contractor shall submit test results for review and approval.

PSR #1476

Wilkinson Boulevard ITS Phase 2 – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Graham Street Extension Intelligent Transportation Systems

This project will install single‐mode fiber optic cable in existing conduits. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Sardis Road Intelligent Transportation System (ITS) – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

West Boulevard ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Sugar Creek Road ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.