McAlpine WWTP Biosolids Treatment Facility Reliability

This will be an Invitation to Bid for Charlotte Water. This project will involve the rehabilitation of Biosolids Treatment Facilities. Facilities generally include digesters, digester control buildings, biogas conditioning facilities, digested sludge storage tanks, and dewatering buildings.

Margaret Wallace Road Sidewalk (Summerfield Ridge Lane to Marshbrooke Road)

This project will install a 6′ concrete sidewalk, 8′ planting strip, concrete curb ramps, Pedestrian Refuge Island, concrete driveways, 2′-6″ concrete curb and gutter, storm drainage systems, and street trees along Margaret Wallace Road from Summerfield Ridge Lane to Marshbrooke Road. The project length is 1,900 LF/0.40 miles.

Sharon Road at Eastburn Road Improvements

This project is located on Sharon Road at Eastburn Road. The project proposes a curve realignment adding a left-turn lane from Sharon Road on to Eastburn Road and removing the superelevation.

CMPD Animal Care and Control Phase 3 Expansion

The purpose of the CMPD Animal Care and Control, Phase 3 Expansion project is primarily to provide additional kennels for dogs and reduce the increasing rate of euthanasia.  Secondly, to provide additional space for other animals and improve the efficiencies of operations for the facility.  The expansion of the facility will possibly be located at 2700 Toomey Avenue and the parcel is currently 4.67 acres. This is the old location for the Animal Humane Society.  We are currently in the advanced planning phase to acquire a schematic design to confirm the estimated construction cost.

The Construction delivery system will be Progressive Design Build. It is also anticipated that the city will acquire an Owner’s Advisor to assist with procurement and additional services during design and construction.

Paving and Patching and Other Misc Water and Sewer Repairs

A construction contract to repairs roadways and their appurtenances related  to water and sewer infrastructure. In addition, minor work could be related to other existing water sewer infrastructure. The scope will also include some concrete and asphalt work within Charlotte Water.

Briar Creek Phase 4 Sewer Rehab

This will be an invitation to bid for construction and will consist of cured-in-place pipe lining, manhole rehab, and other miscellaneous services for several thousand linear feet of current infrastructure. This was originally paired with the Paw Creek/Diversion project and will now be two separate construction projects.

Paw Creek Sewer Rehabilitation and Diversion Structure-CANCELLED

This will be an invitation to bid for construction that will consist of cured-in-place pipe lining, manhole rehab, and a sewer diversion structure. The diversion consists of 200-300 linear feet of sewer pipe and several new manholes. A procurement officer has already been assigned to this.

Stowe Regional Water Resource Recovery Facility Solids Forcemain

Stowe Regional Water Resource Recovery Facility is a new 15 million gallons per day greenfield facility that will serve as CLTWater’s 6th Water Resource Recovery Facility. Stowe Regional Water Resource Recovery Facility will not have solids treatment onsite. The Stowe Regional Water Resource Recovery Facility solids pump station will send the solids stream to another CLTWater water resource recovery facility for treatment. This is a hard bid construction project to build the first phase of the offsite forcemain.

Stowe Regional Water Resource Recovery Facility Solids Pump Station

Stowe Regional Water Resource Recovery Facility is a new 15 million gallons per day greenfield facility that will serve as Charlotte Water’s 6th Water Resource Recovery Facility. Stowe Regional Water Resource Recovery Facility will not have solids treatment onsite. The Stowe Regional Water Resource Recovery Facility solids pump station will send the solids stream to another Charlotte Water Water Resource Recovery facility for treatment. This is a hard bid construction project to build the pump station and associated infrastructure onsite.