Kilborne Drive Streetscape

This project will improve Kilborne Drive from the Eastway Drive intersection to just South of Havenwood Road. Improvements include painted buffered bike lanes, sidewalk, ped crossing medians, traffic calming and street trees. Project connects to the Central/Kilborne/Norland project South of Havenwood Road. (Project length= 0.9 miles)

Pleasant Grove Road Sidewalk- Cancelled

This project will construct sidewalk along the south side of Pleasant Grove Road from Hipp Road to Oakdale Elementary School.   This project has been cancelled.

Shade Valley Realignment Project

Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.

Matheson Avenue Bridge Streetscape

This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.

16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

9th and College Storm Drainage Improvement Project

The 9th and  College Storm Drainage Improvement Project is located in Uptown Charlotte within the 9th Street Right-of- Way between North College Street and the CATS Blue Line Extension light rail. The project will upgrade and replace storm drainage, sanitary sewer, and water main infrastructure within this block of 9th Street. The project will also include sidewalk, hardscape, pavement, and pavement markings replacement.

Storm Water Repair and Improvement FY2021-A

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

Wilkinson Boulevard ITS Phase 2 – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.