Vest Water Treatment Plant to Franklin Water Treatment Plant Force Main and Lee Duke Water Treatment Plant Chem Feed Improvements

 The Project consists of two scopes of work.

Scope 1: Vest Water Treatment Plant to Franklin Water Treatment Plant Force Main consists of installing over 16,000 linear feet of 16” ductile iron piping force main for residual and backwash transfer between the Vest Water Treatment Plant and the Franklin Water Treatment Plant. Installation of all associated fittings, valves, air release valves, trenching, trenchless crossings, parallel future piping, paving, connections, corrosion control, erosion control, cleaning, testing, and all other associated pipeline work. Installation of two crossings at CSX railroad and NCDOT I-85 Interstate, consisting of parallel 16” ductile iron carrier pipe inside single casing. Reporting on material of service connections along alignment and replacing galvanized steel service lines where discovered.

Scope 2: Lee S Dukes High Density Polyethylene (HDPE) Pipeline consists of the installation of 6,000 LF of new 3-inch x 6-inch diameter double wall containment pipe for new chlorine dioxide chemical feed system, including all appurtenances, leak detection system, electrical, testing, and final commissioning. Installation of two (2) new 2-inch diameter HDPE raw water sample lines (approximate length is 6,000 LF for each), including all appurtenances, and testing. Installation of a new raw water sample pump, casing, piping, appurtenances, electrical, and testing at the Raw Water Intake at Blythe Landing. Removal and replacement of various chemical feed lines (11/2-inch and 4-inch diameter) inside existing 8-inch and 12-inch diameter casing pipes. Installation of new fiber optic cable (approximately 6,000 LF) between the Lee S. Dukes WTP and the Raw Water Intake. Installation of new potable water line from Highway 73 to existing Compressor Building, including all appurtenances, and testing.

FY23 Water and Sewer Infrastructure – Contract 1

This contract will provide for new water and sanitary sewer main construction throughout the Charlotte, NC water service area. The majority of this contract will be used to build projects for the Street Main Extension Program.

Briar Creek and Paw Creek Sewer Rehabilitation

This project consists of the sanitary sewer rehabilitation of approximately 13,500 linear feet of sewer outfall with cured-in-place lining. This project will extend along the Briar Creek and Paw Creek outfalls.  A 112 linear feet 24-inch diversion sewer will also be constructed under Briar Creek along with a 118 linear feet 8-inch linear feet collector sewer.

FY23 Large Diameter/Sewer Service Contract #1 (Re-bid)

This contract will incorporate the installation of water and/or sanitary sewer services at a single address, water and/or sanitary sewer service dismantlement at a single address or a water/sanitary sewer main line extension. There maybe more than one water and/or sanitary sewer service installation , water and/or sanitary sewer service dismantlement at the same address. Additionally, a single commercial site with water and/or sanitary sewer services to be installed or water and/or sanitary sewer services to be dismantled at different addresses is to be considered one project for the entire commercial site.

FY23 Large Diameter/Sewer Service Contract #1

This contract will incorporate the installation of water and/or sanitary sewer services at a single address, water and/or sanitary sewer service dismantlement at a single address or a water/sanitary sewer main line extension. There maybe more than one water and/or sanitary sewer service installation , water and/or sanitary sewer service dismantlement at the same address. Additionally, a single commercial site with water and/or sanitary sewer services to be installed or water and/or sanitary sewer services to be dismantled at different addresses is to be considered one project for the entire commercial site.

 

Goose Creek Sanitary Sewer to Cresthill

Project site is mainly wooded and has minimal housing. There will be one crossing on Lawyers Rd. The project will consist of approximately 5,500 linear feet of 8-inch gravity sewer.

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)-DUPLICATE

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove and replace existing copper and fiber communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Tuckaseegee Road Intelligent Transportation System (ITS)

This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.

Freedom Drive Intelligent Transportation System (ITS)

This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug, and trenched conduit, existing conduit, and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment, and other related activities.