McAlpine Preliminary and Primary Treatment Construction Package #1

Provides for rehabilitation of Preliminary and Primary Treatment Facilities. Facilities generally include headworks, flow equalization basins, primary clarifiers, and gravity thickeners. A facilities evaluation, conducted by the design team, will determine the final scope of work.

FY24 Water/Sewer Infrastructure Construction – Contract 3

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low-pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

FY24 Water/Sewer Infrastructure Construction – Contract 2

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

FY24 Small Diameter Water and Sewer Services Contract #2-CANCELLED

This contract is for the continuous installation of small water and sewer services, as needed, for commercial or residential purposes with a diameter of less than one and a half inches. Charlotte Water installed about 1,800 new residential water and sewer taps in the last 12 months. This contract will help meet the demand for these kinds of service connections for the next two years.

cancelled on 3/14/2024

Fiscal Year 2024 Small Diameter Water and Sewer Services Contract #2

This contract is for the continuous installation of small water and sewer services, as needed, for commercial or residential purposes using pipes with a diameter of less than one and a half inches. Charlotte Water installed about 1,800 new residential water and sewer taps in the last 12 months. This contract will help meet the demand for these kinds of service connections for the next two years.

Fiscal Year 2024 Water/Sewer infrastructure Construction – Contract 1

This contract will consist of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low-pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

McAlpine Creek WWTP Administration Renovations–CANCELLED

The project includes, but is not limited to, the renovation of the second floor of the McAlpine Creek WWMF Administration Building and the replacement of HVAC equipment on both floors and outside of the building. Work includes partial demolition of existing facilities to renovate two laboratories, upgrade restroom facilities, convert nonfunctioning lab space into office space, upgrade currently operating lab space, and replace non-functioning HVAC system and associated appurtenances.

Water and Sewer Service Dismantlements

Charlotte Water will be advertising a construction Invitation to Bid for a new Water and Sewer Dismantlement Contract. This contract will provide dismantlement of existing water and sewer services as they are requested by customers.