FY25 Large Service Contract #1

This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter of one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.

FY25 Small Service Contract #1

This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.

Belmont Force Main Construction

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

Belmont Horizontal Directional Drilling Construction

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at This facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.

Belmont Pump Station Construction

This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

Sanitary Sewer Rehab

This will be for a construction contract utilized for sanitary sewer rehab and repairs. Work will be focused on failed or failing sanitary sewer collection system assets. Work performed for this contract will help prevent future sanitary sewer overflows.

FY25 Street Mains Extensions Contract 1 – CANCELLED

This contract will be for the construction of an undetermined number of street mains extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.

Cancelled as of 3/25/2024.

FY24 Street Mains Extensions Contract 2 – CANCELLED

This solicitation will be for the construction of an undetermined number of street main extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as-needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.

Cancelled as of 3/25

Lift Station Improvements Phase 4

Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis.