Sardis Road North Sidewalk

This project will provide new sidewalk along Sardis Road North from Sardis Road to westernmost intersection of Rittenhouse Circle and Sardis Road North. Project length = 0.5 miles.

This project will include the following:
6′ Sidewalk
8′ Planting Strips
2′-6″ Curb and Gutter
Street Trees
Concrete Ped Refuge Island (between Kilcullen Dr. and Rittenhouse Circle)
Concrete Bus waiting pads
Retaining Walls
Curb Ramps
Storm Drainage

7th Street Parallel Bike Routes

This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.

Cross Charlotte Trail (XCLT)− Matheson to Craighead

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

Charlotte Fire Station #2 – Addition and Renovations

The work consists of the addition and renovation of an existing fire station. The locker and restroom facilities will be renovated and expanded. Accessibility improvements are planned in various areas throughout the building and site.

CMGC – ADA Implementation – Phase 1 – Chambers

This project will address the non-conforming, physical ADA barriers to the greatest extent feasible and where applicable under code provisions. Phase 1 addresses barriers in the Charlotte Mecklenburg Government Center Chamber Space. Scope includes the following, but is not limited to, Doors and Door Hardware, Ramps, Seating, Millwork, Speaker Podiums, Media Pit, Dias Access and Entry Vestibule Controlled Access.

Old City Hall – ADA Implementation

This solicitation will be used for addressing the physical barriers identified in the city’s ADA Transition Plan. Areas include but are not limited to; restrooms, water fountains, signage, handrails/guardrails, doors & hardware, main lobby service area, exterior sidewalks, parking, and striping.

McAlpine Creek WWTP Administration Renovations–CANCELLED

The project includes, but is not limited to, the renovation of the second floor of the McAlpine Creek WWMF Administration Building and the replacement of HVAC equipment on both floors and outside of the building. Work includes partial demolition of existing facilities to renovate two laboratories, upgrade restroom facilities, convert nonfunctioning lab space into office space, upgrade currently operating lab space, and replace non-functioning HVAC system and associated appurtenances.

Pleasant Grove Road Sidewalk- Cancelled

This project will construct sidewalk along the south side of Pleasant Grove Road from Hipp Road to Oakdale Elementary School.   This project has been cancelled.