Siphon Pipe Inspection and Cleaning Services – CANCELLED

Charlotte Water will be soliciting proposals from interested companies for siphon pipe inspection and cleaning services. Charlotte Water will be awarding a contract to perform planned siphon pipe inspections and cleaning on a re-occurring maintenance schedule with a standard frequency.

A Charlotte Water representative shall be present when the final cleaning runs are made to ensure cleanliness and will make the final decision on whether the cleaned siphon is acceptable or not. When available, construction drawings of the siphon(s) to be cleaned will be provided.

FY21 Water and Sewer Repairs

The Project consists of water and sewer repair for various streets, highways, parcels, and utility easements within Mecklenburg County.

Tuckaseegee Roundabout

This project will replace the signalized intersection of Tuckaseegee/Thrift/Berryhill with a roundabout.

Peachtree Hills Sidewalk

This project will install sidewalk within the Peachtree Hills area in three (3) locations. The proposed sidewalk will be located along Peachtree Road from Oakdale Road to Crandon Drive, along the northeast side of Beam Lake Drive from Peachtree Road to an existing sidewalk connection 800ft east, and along the south side of Oak Drive from Oakdale Road to an existing sidewalk connection 0.25 miles east.

Sidewalk Gaps and Ramps

This project will be construct various small sidewalk and ramp improvements throughout the City of Charlotte.

Ashley Road Sidewalk

This project will construct sidewalk along the east side of Ashley Rd from Greenland Ave. to Alleghany St. The scope for this project will include an 8’ planting strip where feasible and 6’ sidewalk, driveway improvements, wheelchair ramps and minor curb adjustments to eliminate pinch points for bike lanes.

Bryant Farms Sidewalk

“construction contract for sidewalk project sidewalk along Bryant Farms Road between Hawk Ridge Elementary School and Elm Lane. The total project length is approx. 1.02 miles

Cross Charlotte Trail (XCLT)− Brandywine to Tyvola

The scope and purpose of this project is to complete the City’s 1.5-mile segment of the Cross-Charlotte Trail from the southern end of the existing greenway north of Brandywine Rd to where the County’s new segment begins on the north side of Tyvola Rd.