Miranda Road Firehouse 46

A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

River District Firehouse – Phase 1

Scope Statement: CFD plans to build a temporary firehouse for the newly developed River District to manage response volumes in the area. The firehouse will be located on Dixie River Road, near the future Catawba Crossing, on parcel number 14128101.

The Phase 1 facility will be (1) triple wide trailer to house the firemen and a pre-engineered building to serve as an apparatus bay to house the fire engine and emergency equipment.

This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

Aircraft Rescue and Firefighting Facility (ARFF)

This project will construct a new Aircraft Rescue and Firefighting Facility (ARFF) at Charlotte Douglas International Airport.  The facility will be constructed in a green field site within the airfield.  The general scope of the project includes site preparation (grading and drainage), building construction, HVAC, plumbing, asphalt parking lot and roadway paving, electrical, and associated utilities.

Wilson Air North Parking Lot Improvement

The Wilson Air North Parking Lot Improvement project consists of renovation and expansion of the existing parking lot adjacent to the Wilson Air North Charter Terminal building. The project will add over 100 parking spaces to the current lot involving grading, drainage, curb, gutter and asphalt paving along with fencing, vehicular access control, landscaping and lighting.

 

FY23 Professional Engineering and Land Survey Services for Watermain and Sanitary Sewer Street Main Design/Extensions Contract #3 – CANCELLED

This contract is for professional services in support of the Design and Construction Division. These contracts will allow Design and Construction to assist with LCR projects which typically require a longer and more complicated design process which in turn is more costly. Examples of reasons for increased cost in LCR projects versus typical street main extensions would be the need for geotechnical investigation or wetlands investigation and permitting.

Carolina Aviation Museum Hangar Restoration – CANCELLED

This project’s purpose is to provide a ‘shell restoration’ of the Historic 1938 Aircraft Hangar located on CLT property and will include adaptive reuse of the hangar to maintain the local historic designation and bring the structure up to code making it shell space ready for future interior upfit.

Hidden Valley Firehouse #45

Design and construct a new 2-story, 3-bay firehouse at 14,626 square feet, to be located at 5800 North Tryon Street. This facility will be a new infill firehouse that will alleviate high call volume for surrounding firehouses. A new firehouse must be built when a new “point of dispatch” is required in order to meet response time standards.  The proposed facility will be located on a 2.03-acre parcel that facilitates the redevelopment of abandoned/underutilized sites and vacant sites. This location and site selection shall meet the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

This project will pursue LEED certification. The site will incorporate solar panels and a geothermal well system with water source heat pumps.

Overflow Lots 1 & 2 Asphalt Patching (Construction)

This project will consist of Asphalt Patching in Overflow Parking for Lots 1 & 2.:

1. Approximately 7,500 square feet of asphalt patching at 2” depth per NCDOT Standards
2. Approximately 3,200 square feet of asphalt patching at 10.5” depth per standard below.

Compact 6” ABC stone will be included, as needed, estimated at 100 tons.

These areas will be identified/confirmed on site prior to commencement of work.  Parking lots will be empty and clear of vehicles during this work.

Wilkinson Boulevard ITS Phase 2 – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand-dug and trenched conduit, existing conduit, and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.