Sardis Road Intelligent Transportation System (ITS) – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

West Boulevard ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Sugar Creek Road ITS – CANCELLED

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.

Site Improvements at Charlotte Water’s Field Operations, Zone 1 & 2

The Project consists of the repaving of two different Charlotte Water Facilities: Zone 1 which is located at 11609 Hord Drive Huntersville, NC 28078, and Zone 2 located at 5730 General Commerce Drive Charlotte, NC 28213. Zone 1 encompasses additional aspects besides the repaving, including a proposed storm drainage system, water and sanitary sewer extensions, and the enlargement of the existing detention pond. Zone 2 includes some storm drainage, curb and gutter, and concrete apart from the repaving.