Lawton Road Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Camp Greene/Freedom Drive Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.

Log Cabin 937 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Rocky Falls Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Toomey Storm Drainage Improvement Project

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Airfield Wind Cone Replacement (Informal Bid)

The purpose of this project to remove four (4) existing wind cones located at the north and south ends of airfield at Charlotte Douglas International Airport and install four (4) new wind cones, provided by the Airport. Contractor is responsible to maintain a safe and clean operation and for security of all material and equipment while on site. Contractor is responsible to repair any items damage caused by work performed while on site. All staff assigned to project are required to be badge in accordance with airport security policy. Staff must properly display badge at all time, on the upper part of body visual to security and official members of the Airport. Any loss, damaged or stolen badges MUST be reported immediately to your airport contract.

Carolina Aviation Museum Hangar Restoration – CANCELLED

This project’s purpose is to provide a ‘shell restoration’ of the Historic 1938 Aircraft Hangar located on CLT property and will include adaptive reuse of the hangar to maintain the local historic designation and bring the structure up to code making it shell space ready for future interior upfit.

Fiscal Year 22 Water Main Rehabilitation

This project will clean and apply a polymer coating to the interior walls of old, but still structurally sound cast iron water mains.  Also included is the replacement of all valves, hydrants, and galvanized service lines associated with each project.  The work completed in this contract will improve water quality and flow in the distribution system; consists of an undetermined number of individual projects consisting of water infrastructure rehabilitation; and/or replacements, which will be assigned by the Project Engineer.

Hidden Valley Firehouse #45

Design and construct a new 2-story, 3-bay firehouse at 14,626 square feet, to be located at 5800 North Tryon Street. This facility will be a new infill firehouse that will alleviate high call volume for surrounding firehouses. A new firehouse must be built when a new “point of dispatch” is required in order to meet response time standards.  The proposed facility will be located on a 2.03-acre parcel that facilitates the redevelopment of abandoned/underutilized sites and vacant sites. This location and site selection shall meet the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

This project will pursue LEED certification. The site will incorporate solar panels and a geothermal well system with water source heat pumps.