Underpass Street Lighting Contract

The Contractor (Company) shall inspect, repair and maintain the underpass lighting at project locations as well as evaluate and install new lights at given locations as directed by the City.

Mallard Creek NPW/PW System Rehabilitation (Re-bid)

This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories and FRP (fiberglass reinforced plastic) enclosure.

Mallard Creek NPW/PW System Rehabilitation – CANCELLED

This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants, and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories, and FRP (fiberglass reinforced plastic) enclosure.

Sugar Creek Wastewater Treatment Plant Alkalinity Storage Replacement

This project includes the removal of two high-density polyethene chemical storage tanks and mixers, the construction of a new chemical storage tank containment area, the installation of three new chemical storage tanks (two in the existing containment area and one in the new containment area), installation of a chemical mixer at each tank, installation of a new chemical metering pump in the new containment area, construction of an enclosed pump room within the containment areas, installation of new and replacement of piping, and construction of a canopy over the new containment area.

 

Stowe Regional WRRF Northern Access Road

The Project is for the construction of a new access road to the Long Creek Pump Station and the proposed Stowe Regional Water Resource Recovery Facility (WRRF).  The Northern Access Road consists of approximately 5,500 linear feet of paved open-shoulder roadway with 2-12 feet travel lanes and a dual 8’x7’ reinforced concrete box culvert carrying Long Creek Tributary #1 to its confluence with Long Creek.

Vision Zero On-Call Construction Services-Cancelled

Provide on-call construction services for Vision Zero projects including, but not limited to the following:

  • Pedestrian improvements ranging from pedestrian refuges to full signal design,
  • Safe Routes to School improvements,
  • Sidewalk gap and bus stop improvements on thoroughfares.

CMGC Electric Vehicle Charging Stations Project

This project is for the purchase and installation of up to twenty-five electric vehicle charging stations for the Charlotte-Mecklenburg Government Center (CMGC) Parking Deck. Scope includes all electrical infrastructure work including but not limited to electrical panels, conduits, and concrete work.

Electrical Vehicle (EV) Charging Modification

Installation of two new 150KW electrical vehicle (EV) fast chargers and six EV charging station dispensers for the electrical buses at Charlotte Douglas International Airport (CDIA). The work includes, but is not limited to, the required electrical work to install two new 150KW EV chargers and six charging EV dispensers, with each of the EV chargers supporting three dispensers.