Zone 4 Field Operations Center (Construction Manager-at-Risk)

The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays.  The project will also include demolition of existing facilities in a phased approach so as to minimally impact or impede current operations on the site. The project may also include roadway improvements to West Tyvola Road to increase accessibility to the site.  Rodgers Builders was selected as the Construction Manager at Risk (CMAR)  for this project.

 

State St. Ped Improvement

This project will provide new sidewalk, curb and gutter, drainage improvements, landscaping with Street trees, street resurfacing, and traffic calming bulb outs with small maturing trees in key locations.The project length is 0.468 Miles.

I 77 West Trade Underpass

This project will provide new sidewalk, curb and gutter, drainage improvements, landscaping with Street trees, Pedestrian lighting, artwork, a decorative retaining wall, brick pavers with benches.The project length is 0.2 Miles.