Firestation 33 Roof Replacement

Project consists of roof replacement of Fire Station 33 in Charlotte, NC. This work includes the provision of labor, material, equipment, supervision, an administration.

Replace the existing built-up asphalt roof system with the specified two-ply modified bitumen roof system on 2 roof areas totaling approximately 9,700 square feet of roof area.

 

 

McDowell Roofs Package 3 – Cancelled

This project consists of replacing various roofs at the McDowell Creek Wastewater Treatment Plant.  This package will potentially include the replacement of four separate roofs.

State St. Ped Improvement

This project will provide new sidewalk, curb and gutter, drainage improvements, landscaping with Street trees, street resurfacing, and traffic calming bulb outs with small maturing trees in key locations.The project length is 0.468 Miles.

I 77 West Trade Underpass

This project will provide new sidewalk, curb and gutter, drainage improvements, landscaping with Street trees, Pedestrian lighting, artwork, a decorative retaining wall, brick pavers with benches.The project length is 0.2 Miles.