The Project site is the Catawba Raw Water Pump Station located on Mountain Island Lake, owned & operated by Charlotte Water. The site address is 12548 Pump Station Rd, Charlotte, NC 28216. The work under this project will be primarily in Cells #2 & 3. The electrical work consists of changing the Cell #3 voltage from 2300V to 4160V, including new switchgear, synchronous motor, conduit, cable, etc. as well as re-winding an existing electric pump motor. The civil/mechanical work consists of rebuilding/replacing screens, rehabbing cone valves, and installing a new flow meter vault. The structural work consists of new electrical vault, drywall electrical room, masonry, doors, windows, louvers, and fans. This project also includes upgrades to the fire alarm system for the entire Catawba Pump Station facility.
CMPD University
New Police Station
Fire Station 43
New Fire Station
NE Equipment Yard
New Maintenance Facility
State St. Ped Improvement
This project will provide new sidewalk, curb and gutter, drainage improvements, landscaping with Street trees, street resurfacing, and traffic calming bulb outs with small maturing trees in key locations.The project length is 0.468 Miles.
I 77 West Trade Underpass
This project will provide new sidewalk, curb and gutter, drainage improvements, landscaping with Street trees, Pedestrian lighting, artwork, a decorative retaining wall, brick pavers with benches.The project length is 0.2 Miles.
Convention Center Renovations
Modifications to the Convention Center along Stonewall St.
Sweden Rd. Modifications
Site Construction