Charlotte Fire Station #2 – Addition and Renovations

The work consists of the addition and renovation of an existing fire station. The locker and restroom facilities will be renovated and expanded. Accessibility improvements are planned in various areas throughout the building and site.

Bridge Structures Repairs

This project involves repairing bridge structures in various locations within the city limits. This work shall consist of furnishing all labor, equipment, and materials to repair noted structures. Work includes but not limited to: concrete pavement repairs, asphalt surface sealing / repair / replacement, debris removal, soil / erosion repairs, bridge substructure / superstructure repairs, expansion joint repair / replacement, barrier rail repairs, guardrail repairs, cleaning and painting bridge structures, sealing concrete wearing surface, culvert repairs, and repairs as deemed necessary by the engineer; removing, containment and disposal of existing materials; seeding and mulching all grassed areas disturbed; all incidental items necessary to complete the project as specified and shown on the Bridge Structures Repair Details and Drawings.

CMGC – ADA Implementation – Phase 1 – Chambers

This project will address the non-conforming, physical ADA barriers to the greatest extent feasible and where applicable under code provisions. Phase 1 addresses barriers in the Charlotte Mecklenburg Government Center Chamber Space. Scope includes the following, but is not limited to, Doors and Door Hardware, Ramps, Seating, Millwork, Speaker Podiums, Media Pit, Dias Access and Entry Vestibule Controlled Access.

Beatties Ford Sidewalk Phase 1

This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.

McDowell Roofs Package 3 – Cancelled