Fuel Line Replacement (Canceled Re-Advertise Later Date)

Replace the fuel lines serving the Bank of America and Wilson Air fuel dispending cabinets from the fuel farm. The work includes a combination of fuel line removal/replacement and piping/dispenser cabinet modifications.  The associated civil site work includes demolition, minor fencing, asphalt pavement milling, pavement removal, asphalt paving, and landscaping.

Project will Re-Advertise at a later date.

On-Call Airfield Lighting Maintenance

The Facilities Department of Charlotte Douglas International Airport maintains the airfield, including runways and taxiways and the lights, signs, regulators, and control systems within the AOA. (Aircraft Operational Area). This includes a network of wire and conduit, including cans and manholes. This Contract will be an on-call as-needed basis. It will also include, not be limited to the following: power, distribution, lighting, conduit, panels, equipment connections, and high voltage. Most of this work will be in and on the airfield at Charlotte Douglas International Airport.