New Bern Drainage Replacement Project

This project is comprised of the installation of a new culvert crossing across the light rail alignment, located between New Bern Station and Poindexter Rd.

PSR # 1695

West Ramp Dual Taxi Lanes (Construction)

As part of the West Ramp Dual Taxilanes Project at CLT, this construction package will include widening of the ramp adjacent to Concourse A to allow parallel taxi operations.  The project includes erosion and sedimentation control, grading, drainage, pipe lining of a large drainage pipe, installation of new airfield concrete, full-depth replacement of portions of existing airfield concrete, asphalt paving, marking, and airfield lighting/signage.

Commercial Vehicle Connector Road

The Commercial Vehicle Connector Road project includes the addition of a commercial vehicle road bypass near Gate 80 that connects the existing Rental Car Road and the lower commercial vehicle entrance at the Charlotte Douglas International Airport (CLT) terminal.  This project includes erosion and sedimentation control, grading, drainage, construction of curb and gutter, landscaping, asphalt paving, signage, and utilities.

4th Parallel Runway Package 4: NAVAIDs

To support CLT’s Fourth Parallel Runway Program, this project will include the installation of Navigational Aids (NAVAIDs) for the new Fourth Parallel Runway. To support the new Runway 1C-19C, the project requires construction of glide slope, localizer, approach lighting systems, and all associated support structures, access roads, and infrastructure.  The general scope of this bid package includes demolition, erosion and sedimentation control, grading, drainage, airfield electrical, vehicle service roads, and utilities.

Bridge Structures Repairs

This project involves repairing bridge structures in various locations within the city limits. This work shall consist of furnishing all labor, equipment, and materials to repair noted structures. Work includes but not limited to: concrete pavement repairs, asphalt surface sealing / repair / replacement, debris removal, soil / erosion repairs, bridge substructure / superstructure repairs, expansion joint repair / replacement, barrier rail repairs, guardrail repairs, cleaning and painting bridge structures, sealing concrete wearing surface, culvert repairs, and repairs as deemed necessary by the engineer; removing, containment and disposal of existing materials; seeding and mulching all grassed areas disturbed; all incidental items necessary to complete the project as specified and shown on the Bridge Structures Repair Details and Drawings.

North End Around Taxiway Grading and Drainage

One of seven remaining bid packages within the North End Around Taxiway Program. This package includes the major grading, drainage, utility, and NAVAIDS relocations required by the NEAT.  The modifications to the NAVAIDS include a localizer relocation, modifications to multiple MALSR light stations, new NAVAID shelters and the relocation of an ASOS. These include, but are not limited to, the following: (i) Runway 36C Localizer; (ii) Runway 18C Medium Intensity Approach Light System (MALSR); (iii) Runway 18C Precision Approach Path Indicator (PAPI).  These relocations will require full communication (fiber) connections to the airport fiber system and back-up power.

Concrete Pad at UNCC Vaults

This project will consist of fine grading, pavement, and drainage swale at UNCC (University of North Charlotte Campus) communications cabinet area. Fine grading and rip rap stabilization at Norfolk Southern Spur line.

 

 

 

PSR-844

4th Parallel Runway Runway Package 1: Taxiway V and Connectors

The first phase of constructing the Fourth Parallel Runway at CLT is the southward extension of existing Taxiway V and construction of related connector taxiways.  The project includes demolition, erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, fencing, and airfield lighting/signage.  The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.