Collective AC Storm Drainage Improvement Program

Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 1925 Arnold Dr, 10112 Fairway Ridge, and 1127 Willhaven Dr.  1925 Arnold Dr will involve new drainage structures and reinforced concrete pipe, a modified pipe alignment, new curb and gutter, concrete driveway replacement, sanitary sewer replacement as well as full depth asphalt replacement along Arnold Dr.  10112 Fairway Ridge will involve new drainage structures and elliptical reinforced concrete pipe, a modified pipe alignment, sanitary sewer replacement, concrete driveway and full depth asphalt replacement along Fairway Ridge.  1127 Willhaven Dr will consist of reinforced concrete pipe and drainage structure installation, ditch grading, full-depth asphalt replacement as well as curb and gutter replacement along Willhaven Drive.  There will be 2 culvert replacements not located along Willhaven Drive, 1 will be a driveway culvert located at 5328 Randolph Rd and the other will be crossing under Crestbrook Drive.  Both culverts will consist of reinforced concrete pipe, drainage structures, asphalt replacement, and channel grading.  The culvert under Crestbrook Drive will also require curb and gutter as well as sidewalk replacement.

 

Collective AD Storm Drainage Improvement Program

Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 4213 Tipperary Pl, 2607 Vail Ave, 4600 Randolph Rd.  4213 Tipperary Pl will consist of a reinforced box culvert replacement as well as reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, as well as sidewalk replacement all along Tipperary Place.  2607 Vail Ave will reroute water along Vaile Ave that will consist of new storm drainage pipe and structures as well as sanitary sewer line replacement, concrete driveway and curb replacement, as well as full depth asphalt replacement.  4600 Randolph Rd will consist of CIPP lining across Randolph Rd, a new reinforced concrete pipe alignment with structures, concrete curb, concrete driveway, full depth asphalt, and ditch work along commercial properties and an apartment complex.

Collective Y Storm Drainage Improvement Project

The project consists of multiple isolated storm drainage improvement projects located within the northeast and southeast service areas of the City of Charlotte. Projects include storm drainage improvements and replacement of existing storm drainage systems facilities within the street right-of-way and private, residential properties

Amity Springs Storm Drainage Improvement Project

 

This project is located on Amity Springs Drive near the intersection with Iron Gate Lane. The existing drainage system consists of open channel and culvert under a private road. The improvements include culvert upgrades.

Summerlin Storm Drainage Improvement Project

 

This project is on Brynwood Drive, Wessynton Drive, and Summerline Place. The existing drainage system consists of a pipe system under city-maintained roads. The improvements include pipe system upgrades.

 

Sardis Oaks Storm Drainage Improvement Project

This project is located on Sardis Oaks Road between Sardis Road North and Rock Point Road. The existing drainage system consists of pipe under city-maintained roads. The improvements include pipe system upgrades.

 

Cedar St Storm Drainage Improvement Project

This project is located on South Cedar Street between Stadium View Drive and Westmere Avenue. The existing drainage system consists of a culvert under a city-maintained road. The improvements include culvert and pipe system upgrades.

 

Delane Ave 1220 Storm Drainage Improvement Project

The Delane Ave 1220 storm drainage improvement project will make drainage improvements along Delane Ave from Wright Ave to approximately 80 ft past Castleton Rd.  Drainage and water line improvements will be made along Castleton Rd from Delane Ave to Lomax Ave.  Improvements will consist of new drainage structure, new pipe alignments, curb and gutter along Delane Ave, and the extension of a 6” water line down Castleton Rd.

 

Collective AB Storm Drainage Improvement Project

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.