Craighead/Tryon Storm Drainage Improvement Project

The Craighead/Tryon Storm Drainage Improvement Project is bordered by Glory Street to the north, Little Sugar Creek to the south, Sugar Creek Road to the east and Craighead Road to the west. The existing drainage system consists of pipe system under city-maintained road, state-maintained road, and private property. The improvements include pipe system upgrades.

Gaynelle Storm Drainage Improvement Project

This project is located on Gaynelle Drive between Langley Circle and Running Wood Lane. The existing drainage system consists of open channel and a culvert under a city-maintained road. The culvert system is experiencing blockages and is prone to flooding.

Collective T Storm Drainage Improvement Project

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects involve open channel and closed pipe system on private property and under city-maintained roads.

Collective V (Multiple Isolated Storm Drainage Improvements Projects)

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage improvements and replacement and repair of existing storm drainage system facilities within the street right-of-way and private, residential properties.

Collective Storm Drainage Improvement Project Series Z

Collective Storm Drainage Improvement Project Series Z will be comprised of two separate projects, 1818 Baxter Street and 7316 Thorncliff Drive. 1818 Baxter Street’s main component will include 46 linear feet of 9’x6’ precast reinforced concrete box culvert with sills. 7316 Thorncliff Drive’s main component is 213 linear feet of 6’x7’ precast reinforced concrete box culvert with sills. 7316 Thorncliff Drive will also include storm drainage improvements in the road way with approximately 300 linear feet of 18” to 30” reinforced concrete pipe, and several utility relocations.

Laurel Avenue Storm Drainage Improvement Project

This project is bordered by Laurel Avenue to the north, Dotger Avenue to the south, Randolph Road to the east and Hempstead Place to the west.  The existing drainage system consists of closed pipe systems.  This drainage system is currently undersized and street flooding has been reported on Colville Road and building flooding has been reported on Cranbrook Lane.

Foxrun/Burtonwood Storm Drainage Improvement Project

This project is bordered by Rama Road to the north, McAlpine Creek to the south, Monroe Road to the east and Burlwood Road to the west.  The drainage system consists of open channel and closed pipe systems underneath City maintained roads.  This was previously identified as a major capital project from the watershed ranking prioritization process with a score of 54 of 100.  The ranking protocol identifies 30 structures that experience flooding in the 100-year storm event and 16 roads that experience transverse overtopping events that do not meet current standards.  A holistic project is needed to cost beneficially address the drainage system issues.

 

Canceled – Fairway Ridge Road Storm Drainage Improvement Project

Update: This project will no longer be standalone and will become part of Collective AC SDIP.

This project is located along Fairway Ridge Road bordered by 4 Mile Creek Rd and Ballantyne Commons Pkwy. The existing drainage system consists of the culvert and closed pipe system under city-maintained roads.  The drainage system is in poor condition and flooding has been reported.