Riverbend Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is bordered by Ashton Drive to the north, Sharon Road to the south and east, and Park Road to the west. The existing drainage system consists of open channel and closed concrete and metal pipe systems.

Thermal Culvert Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Camp Greene/Freedom Drive Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.

Log Cabin 937 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Rocky Falls Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Toomey Storm Drainage Improvement Project

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Fuel Line Replacement (Canceled Re-Advertise Later Date)

Replace the fuel lines serving the Bank of America and Wilson Air fuel dispending cabinets from the fuel farm. The work includes a combination of fuel line removal/replacement and piping/dispenser cabinet modifications.  The associated civil site work includes demolition, minor fencing, asphalt pavement milling, pavement removal, asphalt paving, and landscaping.

Project will Re-Advertise at a later date.

N Davidson St 2401 Storm Drainage Improvement Project

The existing pipes at the intersection of N Davidson St and 27th St were determined to be in very poor condition. This project will replace the existing three (3) pipes with one (1) large RCP culvert from the intersection of 27th St and N Davidson St, to the headwall located on the north side of N Davison St.

Briar Creek-Green Oaks Storm Drainage Improvement Project

The Briar Creek/Green Oaks Storm Drainage Improvement Project will replace failing infrastructure within an existing City Storm Water easement. Current failures of the existing culvert pose a threat to residents, vehicle traffic, and apartment homes. This project will replace, rehabilitate, and relocate the drainage system to ensure public safety within the easement.