Beatties Ford Sidewalk Phase 1

This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.

Terminal Sprinkler and Voice Evacuation Upgrade

The Terminal Sprinkler and Voice Evac Upgrade Project consists of two scopes of work, the sprinkler system upgrades and the voice evacuation system upgrades, which will be awarded separately. The Fire Sprinkler System upgrades entail adding sprinkler coverage to various locations throughout the Terminal building. These include areas throughout the ramp and ticket levels, public and non-public areas, and are all located within the secure portion of the Terminal building. The work will cover approximately 110,000SF of currently non-sprinkled existing space and will include necessary patching and painting of all impacted areas. This scope will primarily be night work, 2300-0500, with some opportunity for day work, 0700-2359.

Deluge Fire Protection System Installation

This project is for the installation of a fire protection deluge a dry pilot activation system for the protection of the glass panes located on Concourse E. The contract term will be 6 months.