Lift Station Improvements Phase 4

Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis.

Lift Station Improvements Phase III

Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis.

McAlpine Creek Wastewater Treatment Plant Effluent Filter Backwash Blowers

Charlotte Water will be seeking bids for the purchase two Gardner Denver centrifugal blowers for its McAlpine Creek Wastewater Treatment Plant. These blowers are to be utilized for backwashing effluent filters. Awarded bidder will be responsible for the shipment of the items to the facility. The equipment will be installed as part of a future construction contract. The needed control panels will be supplied by a third party.

Bid price will include a one-year warranty from the time of installation or 18 months from the time of delivery. Bid price will also include up to three one-day site visits to assist Charlotte Water’s third party contractor with installation and start-up as required.