Collective Storm Drainage Improvement Project – Series S

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water, and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential, and commercial properties.

Davidson- Jordan Place Intersection

To improve the North Davidson/ Jordan Place intersection and enhance multimodal transportation choices for users. This project will improve accessibility for pedestrian, bicycle, and vehicular connections to the 25th street light rail station.