Beatties Ford Sidewalk Phase 1

This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.

Air Handler Unit #63 Replacement

The scope of this contract shall be to provide the installation of an air handling unit (#63) to provide the additional air flow and cooling needed to satisfy the heat load on this section of concourse “E”. The contract term is 90 days.

Airport Main Terminal Bagroom Conveyor Upgrades

This contract will be to provide the design, engineering, fabrication, transportation to/from the site, installation, removal, replacement, demolition, modifications, testing, and turning over in working order the Baggage Handling System conveyor equipment upgrades in compliance with specifications and drawings. Project estimated to be completed within a 6 months.