The objective of this RFP is to solicit Proposals that will enable the City to determine which Company(s) and Proposed Solution(s) will best meet the City’s needs for the delivery and setup of traffic control devices in work zones and special event locations as well as the provision of flaggers and other personnel to maintain work zones. The services generally consist of as-needed temporary traffic control services including the rental of arrow signs and portable changeable message signs (PSMS) for scheduled and emergency infrastructure maintenance and for other events requiring the diversion of traffic, lane closures, or notice to the public. This includes the placement and removal of traffic control devices by qualified personnel as well as the flagging of traffic. This will include all materials, equipment, and labor necessary to safely route traffic through CDOT work zones or special event areas.
Cross Charlotte Trail (XCLT)− Tryon to Orr
This project will extend the Cross Charlotte Trail main alignment from N. Tryon Street to Orr Road with additional connectors to the surrounding area.
Beatties Ford Sidewalk Phase 1
This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.
Central Kilborne Norland Intersection & Street Upgrade
Limits are from Woodland Dr. to just south of Havenwood Rd. / Kilborne Dr. intersection (.87 miles). The project includes a new urban greenspace named Potter Place (including public art), separated bike lanes, protected intersection improvements at Central Ave., wayfinding, storm drainage, street trees, and pedestrian medians.
Beatties Ford Rd. Sunset Pedestrian Improvements Phase 1
This project will provide pedestrian and bicycle facilities on Sunset Road from Day Lilly Lane to Beatties Ford Road.
Brown Grier Road Upgrades
This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.
Beatties Ford Rd (LaSalle- Oaklawn) Sidewalks Ph. 1
This project will add sidewalks and amenities along Beatties Ford Rd between LaSalle St and Oaklawn Ave.
I-85 North Bridge (Rebid)
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion at the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.
I-85 North Bridge
This project will construct a bridge over I-85 to directly connect Doug Mayes Place and Louis Rose Place. This will relieve congestion a the WT Harris Blvd/ I-85 and Mallard Creek Church Rd/ I-85 interchanges.