Rea Road Widening (I-485 to Williams Pond Lane)

The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.

University City Blvd Pedestrian Crossings

This Project will install 270 LF of proposed 12′ wide multi-use-path, curb ramps, crosswalks across NC 49, Pedestrian concrete island, milling/resurfacing, storm drainage and pedestrian hybrid beacon with mast arms near the intersection of University Blvd and Mark Twain Road. This project will also install pedestrian crossings, wheelchair ramps, traffic signals milling/resurfacing and storm drainage system at the intersection of University City Blvd and Suther Rd.91347

Sardis Road North Sidewalk

This project will provide new sidewalk along Sardis Road North from Sardis Road to westernmost intersection of Rittenhouse Circle and Sardis Road North. Project length = 0.5 miles.

This project will include the following:
6′ Sidewalk
8′ Planting Strips
2′-6″ Curb and Gutter
Street Trees
Concrete Ped Refuge Island (between Kilcullen Dr. and Rittenhouse Circle)
Concrete Bus waiting pads
Retaining Walls
Curb Ramps
Storm Drainage

7th Street Parallel Bike Routes

This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.

Remount Road and West Boulevard Intersection Improvements

The project consists of intersection improvements at Remount Rd and West Blvd including sidewalks, curb and gutter, decorative pavers, bus shelters with amenities, pedestrian-scale lighting, crosswalks, curb ramps, pedestrian crossing signalization, and landscaping.

Margaret Wallace Road Sidewalk (Summerfield Ridge Lane to Marshbrooke Road)

This project will install a 6′ concrete sidewalk, 8′ planting strip, concrete curb ramps, Pedestrian Refuge Island, concrete driveways, 2′-6″ concrete curb and gutter, storm drainage systems, and street trees along Margaret Wallace Road from Summerfield Ridge Lane to Marshbrooke Road. The project length is 1,900 LF/0.40 miles.

Bridge Structures Repairs

This project involves repairing bridge structures in various locations within the city limits. This work shall consist of furnishing all labor, equipment, and materials to repair noted structures. Work includes but not limited to: concrete pavement repairs, asphalt surface sealing / repair / replacement, debris removal, soil / erosion repairs, bridge substructure / superstructure repairs, expansion joint repair / replacement, barrier rail repairs, guardrail repairs, cleaning and painting bridge structures, sealing concrete wearing surface, culvert repairs, and repairs as deemed necessary by the engineer; removing, containment and disposal of existing materials; seeding and mulching all grassed areas disturbed; all incidental items necessary to complete the project as specified and shown on the Bridge Structures Repair Details and Drawings.