Vision Zero On-Call Construction Services

Provide on-call construction services for Vision Zero projects including, but not limited to the following:

  • Pedestrian improvements ranging from pedestrian refuges to full signal design,
  • Safe Routes to School improvements,
  • Sidewalk gap and bus stop improvements on thoroughfares.

Specialized Roadway Construction Services FY23A

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Specialized Roadway Construction Services FY23B

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Street Resurfacing

This project involves street resurfacing and associated functions throughout the City. The project includes traffic control, asphalt and concrete pavement milling, asphalt paving, base failure repair, asphalt surface treatment, utility adjustments, manhole frame and cover replacements, wheelchair ramp installation, sidewalk, curb repairs, and pavement markings.

Piccadilly Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Farmer Street/Romare Bearden Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is bordered by West Boulevard to the north, Farmer Street the south, Clanton Road to the east and Ross Avenue to the west. The drainage system consists of closed corrugated metal pipe systems underneath City maintained roads. Approximately 3,200 linear feet of 60-inch deteriorated corrugated metal pipe will need to be replaced.

Collective R Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Collective Q Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Rounding Run Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.