Carolina Aviation Museum Sitework

This project consists of site preparation for the future development of the Carolinas Aviation Museum. Specific work includes demolition of existing facilities, earthwork, grading, utility installation, associated asphalt, concrete masonry work, landscaping, and other miscellaneous items.

Hidden Valley Firehouse #45

Design and construct a new 2-story, 3-bay firehouse at 14,626 square feet, to be located at 5800 North Tryon Street. This facility will be a new infill firehouse that will alleviate high call volume for surrounding firehouses. A new firehouse must be built when a new “point of dispatch” is required in order to meet response time standards.  The proposed facility will be located on a 2.03-acre parcel that facilitates the redevelopment of abandoned/underutilized sites and vacant sites. This location and site selection shall meet the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

This project will pursue LEED certification. The site will incorporate solar panels and a geothermal well system with water source heat pumps.

Vacant Parcel / Brush mowing

Provide Brush mow maintenance of city owned parcels, trash removal, minor trimming, landscaping and similar work. The work covered by this project consists of all labor, equipment and performing of all operations necessary to bush hog and otherwise maintain vacant land, fields, drainage areas or otherwise unoccupied land. Work may occur around areas with buildings to
be demolished, construction areas, vacated parking lots, road shoulders or other areas that may present unique hazards. Areas may be sloped, rough terrain or flat ground. Contractor is required to provide all safety operations such as lane closures, signage or similar to create a safe work zone for their staff and limit impacts to traffic or operations around the site. All lane closures will be coordinated in advance with airport representative.

Amazon Property Landscape Maintenance

The Charlotte Douglas International Airport (CLT) seeks to award a contract for Landscaping Maintenance Services of common areas at Amazon Property. All work must meet accepted standards as set forth in industry documents and this scope of services. The Contractor must be able to perform the majority of work each weekday (Monday –Friday) with litter control occurring each day of the week.

Litter and Turf Maintenance, Turf Mowing, Fire Ant Control , Grassed Slopes, Leaf Removal, Pruning – Tree Canopy Elevation, Weed Control and Chemical Use General Guidelines, Application of Herbicides and Pesticides, Tree Rings Weeds, Hard surfaces Zone 3, Mulch Top Dressing, Unit Work: Mulching, Tree and Shrub Fertilization, Tree Planting (damaged trees only),

Airport Main Entrance Landscape Additions

Work to include amending, planting, mulching, chemical application, watering, and all other operations as described herein to create an aesthetic extension to the existing landscape.  Only areas circled on plan maps are in the current scope. To scale AutoCAD plans are available upon request. Work areas are at the intersection of Josh Birmingham and Wilkinson Blvd. and extend
up to the intersection of Scott Futrell.  The contractor is responsible for all utility locates.  Watering services shall be a part of the scope and performed as often as needed for one year after final acceptance to ensure all material remains in a healthy and viable growing condition. If during that time material becomes unacceptably dry or otherwise in poor condition due to watering or lack thereof the monthly payments shall not be made.  Alternate: This work is to remove and replace all magnolias and all gingkos on the west side of
the road in between Scott Futrell and Wilkinson Blvd. with new material of the same species in a 3” caliper. Watering services are part of this alternate.

Queens Road West Water Pipe Replacement Project

Charlotte Water (CLTWater) is planning to replace water services on Queens Road West between East Boulevard and Selwyn Avenue and water pipes under Queens Road West from Wellesley Avenue to Selwyn Avenue and East Boulevard near Queens Road West. The Queens Water Main Replacement Project’s completed design and construction have not been scheduled yet.

Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP)

The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists of the Installation of 394 LF of 5’ X 4’ Precast R.C. Box Culvert; 60 LF of 10’ X 8’ Precast R.C. Box Culvert; 9 masonry drainage structures; and other related storm drainage installation work.

Collective Series J Storm Drain Improvement Project

The Collective Storm Drainage Improvement Project (SDIP) Series J contains three separate projects which vary in size and each bring their unique differences. The work involves various storm drainage improvements including replacement of storm drainage pipes, culvert, masonry drainage structures, water line, sewer line, asphalt pavement, concrete driveways, concrete sidewalk and concrete curb. These improvements will realign storm drainage to reduce structure flooding and address failing infrastructure. Due to the complexity of these projects and their proximity to utility poles/structures/retaining walls, active shoring will be required.

On-Call Landscaping Services (Cancel)

Landscaping services for the airport to include but not limited to edge-line clearing, small scale tree trimming, full clearing of wooded areas, heavy equipment for brush mow work, road shoulder clearing with tree removal, slope clearing, soil and seeding work,

Landscape Services are broken into zones.  Zones have been advertised.