Franklin Water Treatment Plant Main Building Renovations

This will be a request for an Architectural and Engineering service package to retrofit the Franklin Water Treatment Plant Administrative Building. Phase 1 will include overall schematics, the proposed layout of the building, structural assessment, existing conditions drawings, and mapping. Phase 2 will include detailed engineering and structural design, along with architectural design. Phase 3 will include technology requests (Supervisory Control and Data Acquisition system, security, etc.), construction phasing/planning office spaces, finishings, exterior and landscaping. Phase 4 will include project permitting and construction admin services. There is a potential for the renovations to be broken up into smaller projects after Phase 1 is complete.

Plaza Booster Pump Station Upgrades – CANCELLED

CANCELLED – This project is on hold (or potentially canceled) with no anticipated date to advertise in the next 18 months.

 

This project will include the rehabilitation of the Plaza Road and Idlewild Booster Pump Stations. The rehab will include motor control center, soft start drives, station programmable logic controller control panel, pumps, motors, controls valves, suction & discharge piping, generator/transfer switch and necessary building & roof upgrades.